I was approached by the Desert Star Theater to create some backdrops for them like I did in 2008 fo rtheir show “Wizard of Odd”. This year it was for “The Bi-Polar Express”
These drops have to be done in a very short turnaround process, 4 weeks altogether.
1 week of comps and brainstorming to get the feel for the drops they want. Now these drops had existing drops that were painted by hand and now they have a set for their dinner theater also, so they can run the show in both theaters at the same time.
These drops have to be done in a very short turnaround process, 4 weeks altogether.
1 week of comps and brainstorming to get the feel for the drops they want. Now these drops had existing drops that were painted by hand and now they have a set for their dinner theater also, so they can run the show in both theaters at the same time.
They needed a drop to look like the interior of a train car with section in the windows that they will cut out.
This drop was hard because of all the toys and trying to get them to look like they were all individually painted… which they are but you really have to see the detail of the drop to see the painting effect, from a distance they look very picturesque.
This drop was the funnest one to do..it just was really easy and I had fun with it.. of course it was the one that went the fastest.
Each drop took about a week to do and they turned out well. It is a project that could use a lot more time, but time is not an option I have as a freelance artist
Digital Art done in Illustrator and Photoshop CS5